Installing Guardian Tactiles - Internal

The installation process for the Guardian Tactile System has been designed to be as rapid and efficient as possible with minimal disruption to traffic.

Peel and bond installation means our tactile pavers can be fitted into small areas that would be difficult or impossible for laying indicators in alternative materials, such as concrete, tiles and ceramic.

Who installs the tactiles?

The Guardian Tactiles System can be supplied in kit form with installation instructions or we can supply a fully trained team of tradesmen who can travel anywhere in Australia.

Request More Information from our Head Office or one of our
Australian & New Zealand Agents.


Installation Process - See side images (Click on image to see larger version)

Step 1
Thoroughly clean the surface by wiping with a clean rag and acetone. Use a string line or level to mark out the exact area to be tiled.

Step 2
Peel back the adhesive backing and place the tile in the correct position.

Step 3
Remove all backing sheet and proceed to lay the remainder of tiles.

Step 4
Once all tiles are in correct position, proceed to press all tiles down to firmly secure the tactiles to the substrate.

Step 5
The tactile paving is now complete and ready for pedestrian access.

 

 


Installation process - click on image to view larger version

Step 1

Clean surface

Step 2

Peel back adhesive backing

Step 3

Lay tiles

Step 4

Press down firmly

Step 5

Ready for pedestrian access